All news

Pricing1 October 20264 min read

The cheapest quote is usually the most expensive decision

A low number on a quote feels like a win. Here's what it's actually telling you — and what it tends to cost later.

A printed invoice on a worn workshop counter with a ballpoint pen resting across it, lit by a single overhead bulb.

Have you ever accepted the cheapest quote, watched the project drag, and ended up paying someone else to finish it? Most business owners have done this at least once — usually with a website.

The low quote isn't dishonest by design. It's just incomplete. And incomplete work has a way of becoming expensive work.

What the low number is leaving out

A quote can be short for three reasons: the scope is genuinely small, the work will be done cheaply and fast without much care, or some of the cost is being deferred to later.

The third one is the problem. A quote that doesn't include content migration, a working contact form, mobile testing, hosting setup, or admin access isn't a bargain — it's a partial price. You'll pay the rest, just not to the same person on the same invoice.

We see this consistently. A business owner signs at €400 because the other quote was €1,200. Six months later they've paid €400 to a developer, €150 to someone who fixed the broken form, and €80 a month to a hosting provider who attached a long-term contract. They own a site they can't edit, on a server they can't move away from, with a design that isn't theirs.

The €1,200 quote would have been cheaper.

The three hidden costs that show up after launch

These aren't rare. They come up on almost every project that started with a low quote.

Hosting tied to the developer. The cheapest build often means the site lives on the developer's own server account — not yours. If they disappear, are slow to respond, or put prices up, you have limited options. Moving the site costs money and time, and sometimes it means rebuilding parts of it.

A design you can't touch. A fast, cheap build frequently means a template with your logo dropped on top, styled minimally and handed over with no content management system behind it. You want to update your opening hours at 9pm on a Sunday. You can't, unless you call someone. That call costs something, every time.

Scope that grows on contact. The low quote was for five pages. Somewhere in the small print — or nowhere at all — it didn't include the booking form, the gallery, or the second language version. Each one is a separate conversation, a separate invoice. By the third invoice, you're past the price you turned down at the start.

What a real quote is accounting for

A quote that seems high is usually covering things a lower one ignored.

At €700 — our entry price — a Starter site includes custom design, mobile optimisation, a working contact form, basic SEO foundations, domain setup and launch. The client owns every account. There is no ongoing dependency on us for things that should be self-service.

From €1,500, a Business build adds a booking or ordering system, an admin panel the owner can use themselves, and industry-specific features that earn their place. From €3,500, a Custom build includes a dedicated project lead, database design, and integrations with third-party systems.

None of these prices are padded. They reflect what the work actually takes. A quote that comes in well below them isn't doing the same work — it's skipping some of it, or handing the cost to you later.

The question to ask before you compare quotes

When you're looking at two numbers side by side, the useful question isn't "which is cheaper". It's: what does each quote include when the project is finished?

Specifically:

  • Who holds the domain, the hosting account, and the code on launch day?
  • Can you edit content without calling anyone?
  • Is the mobile experience included, or an add-on?
  • What happens when something breaks in month three?

If a quote doesn't answer these, it isn't a complete quote. It's a starting position.

We document scope in writing before a project starts — pages, features, integrations, what's in and what's not. The price is fixed from that point. 30% upfront, 70% on completion. No invoice surprises because nothing moves without a written change.

That's not an unusual way to run a project. It's the only way that protects both sides.

What to do with the low quote you just received

Don't reject it automatically. Ask the questions above and see what comes back. A studio that answers them clearly — even at a lower price — is operating honestly. One that gets vague about ownership, scope, or what happens post-launch is telling you something.

If you want a second opinion on a quote you've received, the 30-minute intro call is free. Bring the quote. We'll tell you honestly whether it covers what your business needs — and if it does, say so.

Got a build in mind?

Tell us what you need. We'll come back with a fixed price and a timeline in weeks.